Lewisham Exchange Project

Lewisham Gateway Phase 2 – In 2024, having previously being entrusted with work on Phase 1, NHB completed work on Phase 2 for the main contractor, MUSE, in Lewisham, South East London. This project encompassed three blocks spanning 65 floors, four separate roofs, and a delivery bay.

NHB installed both the smoke ventilation and environmental systems for this project, which included:

  • Smoke dampers
  • Environmental Volume Control Dampers
  • Automatic Opening Vents (AOV)
  • Several Roof fan sets
  • Several Internal fan sets
  • Temperature sensors
  • Numerous Control panels

We also installed various other components essential to the system.

Our team executed the project to our usual high standards. Below is a selection of images showcasing a fraction of our work here: